看板 Aviation 關於我們 聯絡資訊
以下整理了兩則相關新聞的重點。 1.波音計畫在2015年開設第三條737生產線,以提升737 (MAX) 的生產能量。 2.波音已預計在兩年內將737產量增加到每個月42架。 3.波音近日也為已確認最後版本的737 MAX增加了3項改款。 4.駕駛艙將引進Rockwell Collins的15.1吋顯示器。 5.雖然737 MAX的鼻輪加長了20 cm,但波音已經想到方法消去鼻輪罩的小水泡。 6.另外737 MAX也將採用electronic bleed air system,以提升燃油效率。 7.明年CFM將確定Leap-1B的最終性能。 8.737 MAX除了換上新的發動機之外,還引進了新型分叉式的winglet,787 style的尾 錐,和fly-by-wire spoiler controls等。 Boeing confirms third final assembly line for 737 in 2015 By: Stephen Trimble Washington DC 04:16 15 Nov 2012 Boeing has confirmed plans to open a third final assembly line in 2015 to boost 737 production capacity even beyond the increase to 42 per month planned in two years. The third line will initially be used to build the first four flight test aircraft to support the 737 Max 8 programme in 2015, but will be retained as a growth line for overall production. "Eventually we'll use the third line for future rate increases," says Boeing vice president and general manager Beverly Wyse. Boeing has previously hinted that it could increase 737 production as demand continues to surge for single-aisle aircraft. For example, the company is opening a second line to build wings for the 737 in Renton, Washington, with overall capacity expected to be about 60 shipsets per month. In September, Spirit AeroSystems chief executive Jeff Turner said that his existing 737 fuselage factory in Wichita, Kansas, could support building up to 60 shipsets per month as well. Boeing also announced that the final design of the 737 Max will include Rockwell Collins 15.1in-cockpit displays and eliminate a "bump" in the nose gear door. The changes were added as the 737 Max cleared the company's "firm concept" milestone, meaning the configuration and capability of the aircraft defined in broad terms. Boeing is now working to complete a detailed design of the 737 Max in mid-2013, or shortly after the scheduled engine design freeze of the CFM Leap-1B in April. Boeing expects the 737 Max to consume 13% less fuel than the original version of the next-generation 737NG delivered in 1997. Replacing the CFM56-7B for the Leap-1B engines offers the most significant fuel improvement. Other significant changes includes the addition of split-tip winglets, a redesigned tail cone, electronic bleed air system and fly-by-wire spoiler controls. The larger diameter of the Leap-1B engines forced Boeing to extend the nose gear by 20cm, resulting in a "bump" in the nose gear door. Boeing, however, adopted narrower radial tires for the nose gear and deepened the wheel well, allowing the bump to be eliminated, says Michael Teal, chief project engineer for the 737 Max. The programme remains on track to deliver the first 737 Max 8 in 2017, but "there may be opportunity" to accelerate the schedule, Wyse says. http://www.flightglobal.com/news/articles/boeing-confirms-third-final-assembly -line-for-737-in-2015-379071/ Boeing adds tweaks to final 737 Max configuration By: Stephen Trimble Washington DC 04:08 15 Nov 2012 Boeing has finalised the design and production plan for the 737 Max several months before beginning the detailed design phase of the re-engined and updated single-aisle. The "firm concept" milestone adds three new tweaks to the final configuration - large format cockpit displays, an electronic bleed air system and the elimination of a blister fairing in the nose gear door, Boeing says. Of the changes, the electronic bleed air system may have the most impact on the performance of the 737 Max. It is usually adopted to optimise the cabin pressurisation and de-icing systems, leading to better fuel efficiency. Boeing has promised up to a 13% reduction in fuel burn on the 737 Max, with the integration of the CFM Leap-1B turbofan making the largest contribution. The improvements also include a split-tip winglet, redesigned tail cone and a fly by wire spoiler system. The larger diameter of the Leap-1B fan, which measures 175cm (69.4in), required extending the nose gear by 20.3cm. Boeing initially designed a small "bump" in the nose gear door to accommodate the extension, but subsequently found ways to remove it. Boeing also has decided to add a 737 Max transition line to assemble the first several aircraft. Assembly will then shift to the existing 737 production lines in Renton, Washington, Boeing says. The 737 Max, which has amassed a backlog of 909 orders, is on track for first delivery in 2017, Boeing says. http://www.flightglobal.com/news/articles/boeing-adds-tweaks-to-final-737-max -configuration-379069/ 可以請C教官供跨賣嗎XD -- ※ 發信站: 批踢踢實業坊(ptt.cc) ◆ From: 140.127.14.29
aa4live:現在737有追上320了嗎? 還是照樣被巴假的? 11/20 13:35
ATR72:也沒被巴假的吧,只是空中巴士比較會打價格戰而已 11/20 13:39
ATR72:2012 NB Gross order A/B: 360/1063,看來A廠被電慘了 11/20 14:03
DavidEaston:所以現在線傳飛控的飛機spoiler還是用傳統機械運作? 11/20 14:38
cgy:電子訊號傳送到伺服器,伺服器在作動液壓,推動控制面 11/20 14:59
DavidEaston:那這與第八點的差異在哪? 11/20 15:10
bidet:感覺CI真的可以考慮737MAX,現在CI很缺窄體客機搶區域航線 11/20 15:55
casperlau:飛不過320就巴頭 11/20 15:59
Barbital:737再戰十年 11/20 17:16
ATR72:737準備再戰第6個10年 11/20 17:40
chewie:737 2013特別款新機到港 24期0利率優惠歡迎賞機試駕 11/20 17:53