看板 NCTU-ME93 關於我們 聯絡資訊
4.6 (a) P2=P1*(V1/V2)*(T2/T1) (b) W1-2=P1(V2-V1) 4.13 Knowing the process equation:P=A+bv giving a linear variation of pressure versus volume the straight line in the P-V diagram is fixed by the two points as state1 and state2 The work as the integral of Pdv equals the area under the process curve in the p-v diagram 4.20 Take CV as the R-134a which is the control mass <m=m1=m2> 4.27 Take C.V. as all the argon in both a and b . boundary movement work done in cylinder B again constant external pressure of 150KPA . argon is an ideal gas , so write out that the mass and temperature at state 1 and 2 are the same 4.32 CV R-134a this is a control mass properties from table B5.1 and 5.2 4.39 -W=AEL/2(e)**2 where A is the cross section area E is the modulus of elasticity of steel L is the length of steel rod 4.40 assume a free surface on both side of the frame,ie., there are two surface 20*30 mm 4.46 force balence on the combined set of piston and spring to find the lift pressure. To place the process line in the p-v diagram -- ┌┌┌┌ Origin: 小魚的紫色花園 <fpg.twbbs.org> 140.112.200.214 ───┐┐┐┐
檔案過大!部分文章無法顯示
標題: 轉錄□ 熱力學作業第四章提示 時間: Mon Nov 5 03:31:55 2001 4.6 (a) P2=P1*(V1/V2)*(T2/T1) (b) W1-2=P1(V2-V1) 4.13 Knowing the process equation:P=A+bv giving a linear variation of pressure versus volume the straight line in the P-V diagram is fixed by the two points as state1 and state2 The work as the integral of Pdv equals the area under the process curve in the p-v diagram 4.20 Take CV as the R-134a which is the control mass <m=m1=m2> 4.27 Take C.V. as all the argon in both a and b . boundary movement work done in cylinder B again constant external pressure of 150KPA . argon is an ideal gas , so write out that the mass and temperature at state 1 and 2 are the same 4.32 CV R-134a this is a control mass properties from table B5.1 and 5.2 4.39 -W=AEL/2(e)**2 where A is the cross section area E is the modulus of elasticity of steel L is the length of steel rod 4.40 assume a free surface on both side of the frame,ie., there are two surface 20*30 mm 4.46 force balence on the combined set of piston and spring to find the lift pressure. To place the process line in the p-v diagram -- ┌┌┌┌ Origin: 小魚的紫色花園 <fpg.twbbs.org> 140.112.200.214 ───┐┐┐┐