看板 Oversea_Job 關於我們 聯絡資訊
我剛買了預售屋(而且在下目前還在外州,快蓋好才會搬家),且遞送自己的 floor plan 野人獻曝把這陣子和 builder, agent 討論的 specifications/options 心得 post 出來 List of Specification 1) 2 Side Lights by the front door 2) Full Front Porch with 2 porch lights 3) 2 Driveway lights on each side of Garage Door, 1 Service Door in Garage, and 2 lamp Post lights by walkway to house from driveway 4) Electric Garage Door Operator capacitates a double car width Garage Door. w/ 2 Remotes 5) Furnished Garage 6) Mail Box 7) 2 Garden spickets: 1 in front and 1 in back of house 8) Two Attic louver vents: One on each side of roof 9) 9’ Poured Concrete foundation wall in basement 10) Walk-out and up Areaway w/ 2’ overhang in basement, 1 daylight window, and 1Egress window 11) Radon Piping/Rough-In, Sump Pump Piping/Rough-In and Future Bathroom 12) Plumbing Rough-Ins in basement 13) 1 GFCI outlet over all vanities/Sinks 14) 9’ Ceiling all of 1st Floor living area 15) Expand 1’ (interior room measurement) to left side of house 16) Marble Fireplace surround 17) Electrical Housing in ceiling with dedicated switch in all Bedrooms for future Ceiling Fan/Light 18) 48” wide x 36” deep island (w/ raised breakfast bar) in Kitchen per floor plan 19) Vent out duct for Range exhaust hood 20) 4 Recessed lighting in Kitchen 21) 3/4 hp Garbage Disposal with dedicated switch 22) Water line for Refrigerator with local shut-off 23) Gas: Heat, Water heater, Cooking Range & Oven, Fireplace, and Clothes Dryer 24) Water-Jet message Jacuzzi in Master Bath with separate shower 25) All vanity base cabinet: 36” high List of additional Options with charges 26) Deadbolt for Front and Basement Door 27) 10' x 10' Concrete Patio 28) Move coat closet in foyer area to hallway entering from garage (Fire Proof drywall) 29) Carpeting in stairway and landing down to basement 30) Additional 12" base and wall cabinet in kitchen to left of sink 31) Railing w/ decorative spindles in all staircase main floor along hallway entering from garage, stairway and all 2nd story hallways along staircase, and where it is open to foyer on second floor 32) 10 Year Structural Warranty 33) Laundry tub Install: plumbing and drain complete hook-up 34) Open staircase from main floor to basement with door placed at basement level: finishing drywall, base molding and paint area around stairway 我有 Word 檔,如果這個版面看得很吃力,麻煩站內信給在下。 -- ※ 發信站: 批踢踢實業坊(ptt.cc) ◆ From: 76.226.127.1
Manstein:看起來好高檔。恭喜恭喜! 06/27 01:35