精華區beta FCUProblems 關於我們 聯絡資訊
[開課學院]: 資電學院 [開課系所]: 電機系 [課程名稱]: 電機機械(一) [老師名稱]: 張正泓 老師 [開課學期]: 98-1 [類型]: 98-1期中考2 ------------------------------------------------------------ [1]What are the reasons that the power source is just connect to the high voltage sides of the transformers under testing ? [2]A 5 kVA, 220/110 V,50 Hz transformer is connected to 220 V ,60 Hz power. What will happen? [3]What does the terminology , %IZ , mean ? [4]A magnetic circuit consists of two parts .Length L1 ,L2 ,and cross section areas A1 and A2 .If A1 = 25 cm^2 = 2A2 and L1 = 25 cm = 0.5L2 . Use the Forelich equation B = aH/(b + H) to find the core flux . Assume a = 1.5 T, b = 100 A/m and MMF = 1000 At. [5]Two transformers,each rate 750 kVA,23000/230 V , are connected iv V connection. (a)Sketch the wiring and phasor diagrams (b)Find the maximum capacity this system can supply. (c)A 1000 kVA , 230 V , 0.8 lagging power factor , three-phase , delta- connected load is connected to the system . Find the line current on high- voltage side. [6]A single-phase , 50 kVA , 3000/300 V two winding transformer is connected as an autotransformer to supply a rated load of 3300 V. The power source is 3000V. (a)Draw the schematic wiring diagram . Mark all the voltage and currents. (b)Find the capacity of the autotransformer. ------------------------------------------------------------ -- ※ 發信站: 批踢踢實業坊(ptt.cc) ◆ From: 61.62.104.252